Skip to content
HETZENGINEERING

Regulation · Product cybersecurity

Cyber Resilience Act

Since 11 September 2026, manufacturers must report actively exploited vulnerabilities and severe security incidents – including for products that have long been in the field. From 11 December 2027 all requirements apply: products with digital elements placed on the market from then on need CRA conformity for CE marking. We get your devices' development, processes and evidence there – drawing on hands-on work with IEC 62443-4-1 and functional safety.

  • 10 Dec 2024

    Entered into force – Regulation (EU) 2024/2847

  • 11 Sep 2026

    Reporting obligations apply – also to products in the field

  • 11 Dec 2027

    All requirements apply – CE marking for new products only with CRA

  • ≥ 5 years

    Support period for security updates, unless the product is used for less

Applies to everyone placing products with digital elements on the EU market – including Swiss manufacturers who supply the EU.

Services

From the first check to the evidence – technical, not legal.

  • 01

    CRA readiness check

    Where does your product stand? We classify it (default, important class I or II, critical), derive the conformity assessment procedure, check it against the essential requirements of Annex I and present a prioritised roadmap to December 2027. Also available as a fixed-price package.

    ResultProduct classification, gap list, roadmap to 12/2027

    • CRA
    • Annex I
    • Product classes
    • Fixed price
  • 02

    Vulnerability handling and reporting process

    Generate and maintain a software bill of materials (SBOM), assess and fix vulnerabilities, introduce coordinated vulnerability disclosure. Plus the reporting route for actively exploited vulnerabilities and severe incidents with 24-hour early warning, 72-hour notification and final report – including which CSIRT is responsible for a manufacturer without an EU establishment. This obligation already applies.

    ResultSBOM process, vulnerability and reporting workflow, templates

    • SBOM
    • CVD
    • PSIRT
    • Art. 14
  • 03

    Secure development lifecycle to IEC 62443-4-1

    Security by design within your existing development process: threat analysis, security requirements, secure coding and static analysis, security tests in the CI/CD pipeline, secure update paths. Built into your toolchain, not bolted on.

    ResultProcess description, quality gates in the pipeline, evidence

    • IEC 62443-4-1
    • Threat modelling
    • SAST
    • CI/CD
  • 04

    Technical documentation and conformity assessment

    Risk assessment, technical documentation, support period, EU declaration of conformity – structured so an assessor can read it. Where the product class requires a notified body, we prepare and accompany the assessment.

    ResultDocumentation structure, conformity documents, audit readiness

    • Technical documentation
    • Declaration of conformity
    • CE
  • 05

    Security tests in test automation

    Robustness of communication interfaces, secure default configuration, update and reset mechanism, access protection – as automated test cases in your existing test environment, so every release delivers its evidence along with it.

    ResultSecurity test cases, automated evidence per release

    • Security tests
    • HIL
    • Test automation
  • 06

    Vulnerability monitoring subscription

    Continuously check your SBOM against newly published vulnerabilities, assess relevance, recommend updates and support notifications – across the whole support period. See ongoing support.

    ResultMonthly report, assessment of new vulnerabilities, reporting support

    • Monitoring
    • SBOM
    • CVE
    • Subscription

Standards and terms

  • Regulation (EU) 2024/2847
  • IEC 62443-4-1
  • IEC 62443-4-2
  • SBOM
  • CVD
  • Regulation (EU) 2023/1230
  • IEC 61508

Typical situations

  • 01

    “We don't know whether our product is affected.”

    Classification first: affected or not, which class, which procedure – and what it means up to 2027.

  • 02

    “A customer is asking for an SBOM.”

    Generate the SBOM from the build, check it and keep it current – in the pipeline, not once by hand.

  • 03

    “A vulnerability is being exploited. Who reports what, by when?”

    Reporting route, roles and templates are in place before it gets serious – 24 hours is short.

  • 04

    “Our development process has no security chapter.”

    Introduce IEC 62443-4-1 step by step without stopping ongoing development.

Also affected

Machinery Regulation from 20 January 2027

The EU Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive. It sets requirements for safety-related control systems and software and demands protection against corruption. For machine and plant builders we combine CRA, IEC 62443 and functional safety to IEC 61508 into one consistent body of evidence instead of three separate projects.

Reference from this area

Details on the projects page.

All projects
  • since 05/2025

    ABB Switzerland Ltd, Turgi

    Independent review of the test concept of a medium-voltage platform including a CRA readiness assessment against IEC 62443-4-1, roadmap for SAST and CI/CD.

We work on the technical and process side. For the legal assessment of individual cases we coordinate with your legal department.

How far is your product from CE marking under the CRA?

An intro call settles in 30 minutes whether and how your product is affected and what needs doing by December 2027.

Book an intro call30 min · online · no obligation

What happens next

  1. 01

    Intro call

    30 minutes online: your task, our questions, a first assessment.

  2. 02

    Short written assessment

    Whether and how we can help, which approach fits, roughly what it takes.

  3. 03

    Offer with a clear scope

    Service, result, time frame – you decide, we start.

Prefer writing? Send an email

Book an intro call Call